EnergiX-P40 catalogue
1.0
Applications
The world is entering the digital era at a faster speed than expected. Digital priority has become the core of the new needs of enterprises after the pandemic. More than 86% of the enterprises in the world will carry out digital transformation. By 2024, more than 51% of the global IT budget will be put in digital innovation/ transformation, while for China, this number will be over 70%. AI, cloud computing, 5G, streaming media and IOT drive the demand for larger data storage, stronger data computing ability and faster data interaction. As the key infrastructure and physical carrier in the digital era, data center has gradually changed from cost center to service center, from supporting business development to driving business development, and has become the accelerator of business innovation. Data center construction is a complex system engineering. From initial design and planning to the project construction, and then to the installation of supporting facilities and later operation and maintenance services, every components need to be connected and complement each other. 1HZWHFKQRORJLHVQHZVHUYLFHVDQGQHZDSSOLFDWLRQVDUHSURIRXQGO\DŴHFWLQJWKHFRQVWUXFWLRQPRGHDQG2 0PRGHRIWKHQHZJHQHUDWLRQ cloud data center, which poses new challenges to the design concept, construction standards, delivery speed, network structure
Data center topology diagram
IT Equipment (Critical load)
PDU A
PDU A
Mechanical Load (Cooling)
LV Switchgear
LV Switchgear
UPS N
UPS +1
UPS N
UPS +1
Switchgear
Switchgear
Gen Switchgear
Main Switchgear
Gen Switchgear
Main Switchgear
G ~ N
G ~ N
G ~ N
G ~ N
Utility food A
Utility food B
+
+
Diesel Generator
T4 (Level A)
2 Mains
UPS
Value to the customer
Safety
Customization
Durability
The product has passed IEC 61439-2 type test and seismic test to ensure the safety of personnel. The high breaking capability can break 15kA fault currents
Flexible cables entry/exit type" and modular structure layout to meet customization needs
IP31 and corrosion protection process allow the PDU to be used outside the equipment room