Designed for Reliability, Built for the Future To address these challenges, CHINT provided standardized, high- performance low-voltage solutions across MRT Corp’s major rail projects. The solution enabled MRT Corp to achieve key operational and project efficiencies: • Simplified deployment through modular, pre-qualified components that reduced installation time and engineering complexity. • Maintain continuous operations that stable power delivery in high- demand, high-traffic environments. • Scalable infrastructure that supported seamless integration across new and future transit lines, including the LRT Shah Alam Line.
CHINT Products Installed
• NA1 Air Circuit Breakers (ACB) • NM8 & NM1 Molded Case Circuit Breakers (MCCB) • NB1-63H Miniature Circuit Breakers (MCB) • NL1 Residual Current Circuit Breakers (RCCB) • NC1 and CJ19 Contactors • NEW7G Metal Clad Switches
Delivering the Power Behind a More
Connected City
With CHINT’s standardized low-voltage solutions, MRT Corp achieved measurable results across its expanding rail network: Seamless Operations Maintained uninterrupted service across all lines with reliable, resilient power systems. On time-to-completion Met project timelines through standardized, uniform components that streamlined deployment and maintainance. Scalable infrastructure Deployed a future-ready power system that now supports over 100 stations, with capacity to scale further. Standardization was key, enabling MRT Corp to deliver reliable service while expanding efficiently. Consistency in design led directly to better control over cost, time, and performance.
CHINT delivered a scalable, standardized solution that addressed the complexity of a multi-line rail system.
GET IN TOUCH WITH US! CHINT Global International Pte Ltd Tel: +65 6329 3110 Email: Sales.APAC@CHINT.com Web: www.CHINTGlobal.com
Powered by FlippingBook