CHINT's Mining Industry Solutions

2.4

MINING INDUSTRY PROMOTION CATALOG

35kv SVG without transformer in the application of photovoltaic power station of HaMi Power quality products

2

The photovoltaic power station battery module is inverted by 96 PV inverters, and voltage is boosted to 35KV by 48 box type boost transformer, which is paralleled in 35kv bus through 4 collection line. Finally voltage is boosted to 110kv by main boost transformer. 35kv SVG is paralleled in 35kv bus of booster station by separate 35kv collection line. The primary connection diagram of booster station is as shown in Figure 2.

Tanzania Bulyanhulu gold mine project

Guazhou site gansu province

Mexico

Mexico iusa SOLAR

CHINT 22

Powered by